![]() St John's Episcopal Church, Parking and New Sanctuaryĥ914 Thornhill Drive, 5928 Thornhill Drive, 1707 Gouldin Road, 1715 Gouldin Road, and 1676 Alhambra Lane Pali Court, north of intersection with Glen Arms Drive Pali Court Estates Subdivision and Residential Development Oakland Army Base Auto Mall Project (2006) 2 to the 2002 Oakland Army Base Reuse Plan EIRĬWS North Gateway Recycling Facility_Addendum July 2021 Feasibility Study for Adaptive Reuse of the Existing Oakland Army Base Warehouses (2012)Īddendum No.Adaptive Reuse Feasibility Study for Ancillary Maritime Support (AMS) Activities (2007).Feasibility Study of Adaptive Reuse for Auto Dealership Activities: East Gateway Subarea, Oakland Army Base (2006).Architectural Salvage Assessment: Contributing Buildings, Oakland Army Base Historic District, Oakland, California (2006).Oakland Army Base Historic Building Reuse Alternatives Report (2002).Operational Air Quality Plan (for All Prologis Warehouses at the Oakland Army Base) (3/26/18).Diesel Emission Reduction and Air Quality Plan for Operations of the ConGlobal Container Depot and Repair Site (Prologis) (3/26/18).City Administrator Approval of Southeast and Central Gateway Air Quality Plan for Construction (Prologis) (11/30/17).Southeast and Central Gateway Air Quality Plan for Construction (Prologis) - FINAL (10/16/17).Southeast and Central Gateway Air Quality Plan for Construction (Prologis) - DRAFT (08/03/17).City Administrator Approval of Northeast Gateway Air Quality Plan for Construction (Prologis) (10/4/16) (16 MB).Northeast Gateway Air Quality Plan for Construction (Prologis) (8/30/16) (8 MB).Northeast Gateway Air Quality Plan for Construction (Prologis) - DRAFT (4/25/16) (5 MB).City Administrator Approval of Construction-Related Air Quality Measures ("Air Quality Plan") (12/5/13) (8 MB).Construction-Related Air Quality Measures ("Air Quality Plan") (11/11/13) (20 MB).Construction-Related Air Quality Measures ("Air Quality Plan") - DRAFT (5/8/13) (22MB).Standard Conditions of Approval and Mitigation Monitoring and Reporting Program Report (SCA/MMRP): 2 Project Description 3-Chapters 3.0 through 3.7 Chapters 3.8 through Chapter 4.0Īppendix A: Air Quality and Greenhouse Gas Emissions Model OutputsĪppendix B: Transportation and Traffic OutputsĪppendix C: Water Supply Assessment CorrespondenceĪppendix D: Tidelands Trust Exchange Agreement MaterialsĪppendix E: 2002 Draft Environmental Impact ReportĪppendix F: 2002 Final Environmental Impact ReportĪppendix G: Supplemental Environmental Impact Report for the OARB Automall ProjectĪppendix H: First Addendum to the Supplemental EIR for the OARB Automall ProjectĪppendix I: 2002 Mitigation Monitoring and Reporting ProgramĪppendix J: 2012 Mitigation Monitoring and Reporting Program RoadmapĪppendix K: Draft Technical Memo: Traffic Analysis for Detour – 7th Street Grade SeparationĪppendix L: Feasibility Study for Adaptive Reuse of the Existing OARB Warehouses ![]() Note: The IS/Addendum is also broken into four, smaller files for easier downloading: 1-Cover, TOC and Ch. Summary of the 2012 OARB Initial Study/Addendum OARB Warehouse Feasibility Study - October 2006 Remedial Action Plan / Risk Management Plan (RAP/RMP) – Sept. ![]() Southside of East 12th Street between 26th Avenue and Derby Avenueĭraft EIR Traffic Supplemental- April 2002
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |